Bear River Band of the Rohnerville Rancheria Comprehensive Economic Development Strategy (CEDS)

April 5, 2024
A tidal channel in the Eel River Estuary near Loleta, California

Project Summary

Bear River Band, California

The Bear River Band of the Rohnerville Rancheria charting five years of economic development near Loleta.

Eel River Estuary near Loleta. Photo: BookOfDisquiet, CC BY 4.0, cropped

ClientBear River Band of the Rohnerville Rancheria
CompletedApril 2024
ScopeComprehensive Economic Development Strategy
Plan Period5 Years

Key Findings

01

664

Enrolled members

The Band has 664 enrolled members, 367 adults and 297 under 18. About 213 people live on the Rancheria itself.

02

131

Qualified survey responses

A survey from July to September 2023 gathered 210 responses, 131 of them qualified for analysis. About 38% of respondents work for the Band.

03

173

Acre Rancheria land base

The Rancheria sits on a 173-acre parcel near Loleta, with very little land left for housing. About 100 more acres of surrounding land is under application for tribal trust.

Source: Points Consulting, Bear River Band Comprehensive Economic Development Strategy, April 2024.

Project Overview

Our team completed a Comprehensive Economic Development Strategy (CEDS), for the Bear River Band of the Rohnerville Rancheria located near Loletta California in April 2024. The CEDS outlines the Tribe’s greatest strengths, weaknesses, opportunities, and threats. It highlights goals and related actions for the Tribe to accomplish in the next five years, along with impacts for the next seven generations. The CEDS relies on a number of available databases and a community engagement aspect targeted toward Bear River Band members to fully encompass the Tribe’s desires and needs.